Subdivision Plan

Subdivision PlanSubdivision plan: A subdivision plan is needed when a large lot is subdivided into smaller lots. Sometimes a subdivision plan is needed to see how many lots a piece of land will yield.

What is needed: A list of guidelines is needed to draft a subdivision plan. Those guidelines can include the area of each house, the width of the road(s) in the subdivision, the space between houses, etc. Typically the guidelines are from the permit department.

Cost: Cost to draft a subdivision is $259.

Turnaround time: Tupical turnaround time for a subdivision plan is 2 business days.